Bullock Museum 3rd Floor Exhibit Expansion
📊Project Metrics
TDLR #TABS2019005925Project Closed
Project has been completed and closed
📋Scope of Work
Demolish existing wall, build new walls, patch fireproofing, install new suspended ceiling, extend mechanical and electrical service, adjusts sprinkler heads and fire alarm system, patches existing walls, repaints area, installs carpet
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
New construction in-ground pool and spa.
New construction single family residential 2-story 4 bedroom 3.5 bath with covered front porch covered rear patio 2 uncovered front balconies and uncovered rear balcony.
New construction in-ground pool and spa.
Remodel and Addition to Existing Fuel Station 2023 001465 DA - Approved
Installing (1) Car EV Charger Inside residence Garage that includes up to 15-Feet from the electrical panel; All electrical wiring included. No meter work will be done per EC