SM CTEC Property Finish Out
SM CTEC Property Finish Out is a renovation/alteration project at 2430 S IH 35, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2019). The project has an estimated value of $2.0M across about 11,285 sq ft.
๐Project Metrics
TDLR #TABS2019007032Project Closed
Project has been completed and closed
SM CTEC Property Finish Out is a Renovation/Alteration project located at 2430 S IH 35, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $2.0M covering 11,285 sq ft. Joshua Hu is the property owner and Malone Maxwell Borson Architects is the design firm of record. The project was registered with TDLR on March 14, 2019.
โFrequently Asked Questions
What is SM CTEC Property Finish Out?
SM CTEC Property Finish Out is a renovation/alteration project at 2430 S IH 35 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out of new single-story shell space with no changes in level. Interior partitions, finishes, millwork, and MEP including rooftop mechanical units. Medical (optometry) component and retail (glasses) component.
Is SM CTEC Property Finish Out open in San Marcos?
Construction on SM CTEC Property Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2019. The building is finished and very likely open.
Where is SM CTEC Property Finish Out located?
SM CTEC Property Finish Out is located at 2430 S IH 35, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of SM CTEC Property Finish Out?
Joshua Hu is the property owner/developer of record for SM CTEC Property Finish Out, per its TDLR project registration.
Who is the architect or design firm for SM CTEC Property Finish Out?
Malone Maxwell Borson Architects is the design firm of record for SM CTEC Property Finish Out, according to its TDLR filing.
How much does SM CTEC Property Finish Out cost and how big is it?
SM CTEC Property Finish Out has an estimated construction value of $2.0M and approximately 11,285 square feet (about $175/sqft), based on its TDLR filing.
๐Scope of Work
Tenant finish out of new single-story shell space with no changes in level. Interior partitions, finishes, millwork, and MEP including rooftop mechanical units. Medical (optometry) component and retail (glasses) component.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 14, 2019
Review Complete
Inspection Complete
Closed
Oct 30, 2019
๐Related Projects
๐๏ธSame Design Firm
$956.2M total๐Related City Permits
Building permits found at or near this location
227 L FT tunneling & 76 L FT trenching to repair broken sewer lines under the slab on building 3. 30 fixture connections
Replacement of complete existing central heat and air system with or without duct work
repair damaged wire in service gutter
Lexington Hills - Monument
replace damaged meter jaw sparking possible hazard