Ford of
Ford of is a additions to existing building project at 31480 IH-10 West, Boerne, in Kendall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $400K across about 11,620 sq ft.
๐Project Metrics
TDLR #TABS2019007382Project Closed
Project has been completed and closed
Ford of is a Additions to Existing Building project located at 31480 IH-10 West, Boerne, TX 78006 in Boerne, Texas. The project has an estimated value of $400K covering 11,620 sq ft. Walter Shepard is the property owner and Lisbona Architects Inc is the design firm of record. The project was registered with TDLR on March 19, 2019.
โFrequently Asked Questions
What is Ford of?
Ford of is a additions to existing building project at 31480 IH-10 West in Boerne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Pre-engineered metal building addition to existing structure
Is Ford of open in Boerne?
Construction on Ford of is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is Ford of located?
Ford of is located at 31480 IH-10 West, Boerne, TX, 78006, in Kendall County.
Who is the owner or developer of Ford of?
Walter Shepard is the property owner/developer of record for Ford of, per its TDLR project registration.
Who is the architect or design firm for Ford of?
Lisbona Architects Inc is the design firm of record for Ford of, according to its TDLR filing.
How much does Ford of cost and how big is it?
Ford of has an estimated construction value of $400K and approximately 11,620 square feet (about $34/sqft), based on its TDLR filing.
๐Scope of Work
Pre-engineered metal building addition to existing structure
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 19, 2019
Review Complete
Inspection Complete
Closed
Dec 31, 2019