Wave Bowl Bibimbop
Wave Bowl Bibimbop is a renovation/alteration project at 8608 Preston Rd. #111, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $147K across about 2,200 sq ft.
๐Project Metrics
TDLR #TABS2019007933Review Complete
Design review complete, construction may proceed
Wave Bowl Bibimbop is a Renovation/Alteration project located at 8608 Preston Rd. #111, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $147K covering 2,200 sq ft. Pete Keopaseut is the property owner and Wang Engineering, INC. is the design firm of record. The project was registered with TDLR on March 26, 2019.
โFrequently Asked Questions
What is Wave Bowl Bibimbop?
Wave Bowl Bibimbop is a renovation/alteration project at 8608 Preston Rd. #111 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A restaurant will be constructed from the ground up. It will be in a open space building. New plumping, electrical, and walls will be built. New AC units will be install. It will be an open ceiling in the dining area.
Is Wave Bowl Bibimbop open in Plano?
Wave Bowl Bibimbop is currently under construction in Plano, TX. Its current TDLR status is "Review Complete".
Where is Wave Bowl Bibimbop located?
Wave Bowl Bibimbop is located at 8608 Preston Rd. #111, Plano, TX, 75024, in Collin County.
Who is the owner or developer of Wave Bowl Bibimbop?
Pete Keopaseut is the property owner/developer of record for Wave Bowl Bibimbop, per its TDLR project registration.
Who is the architect or design firm for Wave Bowl Bibimbop?
Wang Engineering, INC. is the design firm of record for Wave Bowl Bibimbop, according to its TDLR filing.
How much does Wave Bowl Bibimbop cost and how big is it?
Wave Bowl Bibimbop has an estimated construction value of $147K and approximately 2,200 square feet (about $67/sqft), based on its TDLR filing.
๐Scope of Work
A restaurant will be constructed from the ground up. It will be in a open space building. New plumping, electrical, and walls will be built. New AC units will be install. It will be an open ceiling in the dining area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 26, 2019
Review Complete
Mar 26, 2019
Inspection Complete
Closed