7-Eleven is a renovation/alteration project at 6004 FM 969, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2019). The project has an estimated value of $225K across about 4,065 sq ft.
๐Project Metrics
TDLR #TABS2019008355Project Closed
Project has been completed and closed
7-Eleven is a Renovation/Alteration project located at 6004 FM 969, Austin, TX 78721 in Austin, Texas. The project has an estimated value of $225K covering 4,065 sq ft. Ron Urrabaz is the property owner and The Dimension Group is the design firm of record. The project was registered with TDLR on April 1, 2019.
โFrequently Asked Questions
What is 7-Eleven?
7-Eleven is a renovation/alteration project at 6004 FM 969 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel of an existing single story convenience store.
Is 7-Eleven open in Austin?
Construction on 7-Eleven is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2019. The building is finished and very likely open.
Where is 7-Eleven located?
7-Eleven is located at 6004 FM 969, Austin, TX, 78721, in Travis County.
Who is the owner or developer of 7-Eleven?
Ron Urrabaz is the property owner/developer of record for 7-Eleven, per its TDLR project registration.
Who is the architect or design firm for 7-Eleven?
The Dimension Group is the design firm of record for 7-Eleven, according to its TDLR filing.
How much does 7-Eleven cost and how big is it?
7-Eleven has an estimated construction value of $225K and approximately 4,065 square feet (about $55/sqft), based on its TDLR filing.
๐Scope of Work
remodel of an existing single story convenience store.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 1, 2019
Review Complete
Inspection Complete
Closed
Oct 30, 2019
๐Related Projects
๐คSame Owner
$900K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Gas Horizontal System
Emergency Repair of riser and replacement of meter