Design review complete, construction may proceed
Royalwood Elementary School Renovations is a Renovation/Alteration project located at 7715 Royalwood Dr., Houston, TX 77049 in Houston, Texas. The project has an estimated value of $280K covering 67,686 sq ft. Sheldon ISD; Contact: John Kirchner is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on April 10, 2019.
CONVERT (2) EXISTING ROOMS / SPACES INTO HIGH TECH LEARNING SPACES, INCLUDING THE REMOVAL OF (1) PARTITION WALL. PROVIDE AND INSTALL NEW STOREFRONT GLAZING SYSTEM WITH DOORS. REPLACE FLOORING IN THESE ROOMS AND PAINT. PROVIDE & INSTALL VINYL WALL GRA
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 10, 2019
Review Complete
Apr 10, 2019
Inspection Complete
Closed