District Six
District Six is a renovation/alteration project at 105 W 9th, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 1,800 sq ft.
๐Project Metrics
TDLR #TABS2019009117Review Complete
Design review complete, construction may proceed
District Six is a Renovation/Alteration project located at 105 W 9th, Georgetown, TX 78626 in Georgetown, Texas. The project has an estimated value of $250K covering 1,800 sq ft. Conreco, INC is the property owner and Optima Pools is the design firm of record. The project was registered with TDLR on April 10, 2019.
โFrequently Asked Questions
What is District Six?
District Six is a renovation/alteration project at 105 W 9th in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demo some existing walls and build out small kitchen and dining area
Is District Six open in Georgetown?
District Six is currently under construction in Georgetown, TX. Its current TDLR status is "Review Complete".
Where is District Six located?
District Six is located at 105 W 9th, Georgetown, TX, 78626, in Williamson County.
Who is the owner or developer of District Six?
Conreco, INC is the property owner/developer of record for District Six, per its TDLR project registration.
Who is the architect or design firm for District Six?
Optima Pools is the design firm of record for District Six, according to its TDLR filing.
How much does District Six cost and how big is it?
District Six has an estimated construction value of $250K and approximately 1,800 square feet (about $139/sqft), based on its TDLR filing.
๐Scope of Work
Demo some existing walls and build out small kitchen and dining area
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 10, 2019
Review Complete
Apr 10, 2019
Inspection Complete
Closed
๐Related City Permits
Building permits found at or near this location
addition of new breezeway structure and retroactive permit for accessory structure attached to breezeway
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
irrigation install
irrigation install