Hi Shine Car Wash
📊Project Metrics
TDLR #TABS2019009459Project Closed
Project has been completed and closed
📋Scope of Work
New construction of a tunnel car wash
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
REMOVE EXISTING ELECTRICAL SERVICE EQUIPMENT AND INSTALL A NEW 200-AMP MAIN BREAKER PANEL (OUTDOOR SURFACE-MOUNTED UP TO 42 CIRCUITS). -INSTALL A NEW 200-AMP RATED METER BASE (METER CAN) APPROVED BY THE LOCAL UTILITY. -UPGRADE THE ELECTRICAL SERVICE TO 200 AMPS INCLUDING NEW SERVICE MAST SERVICE ENTRANCE CONDUCTORS AND WEATHERHEAD AS REQUIRED. -INSTALL A COMPLETE GROUNDING AND BONDING SYSTEM INCLUDING: -TWO (2) 8-FT COPPER GROUND RODS BONDED TOGETHER WITH #4 COPPER GROUNDING ELECTRODE CONDUCTOR -BONDING TO THE METAL WATER LINE AT EXTERIOR SPIGOT WITH #4 COPPER CONDUCTOR -INSTALL A WHOLE-HOME SURGE PROTECTION DEVICE AT THE MAIN PANEL. -REPLACE EXISTING 50-AMP SUBPANEL WITH A NEW CUTLER-HAMMER RATED SUBPANEL. -INSTALL SIX (6) AFCI BREAKERS IN THE NEW SUBPANEL. -INSTALL ONE NEW DEDICATED 50-AMP 120/240V OVEN CIRCUIT (UP TO 30 FT) WITH A 50-AMP GFCI BREAKER.
This permit request is for the sewer and domestic water systems. Jimmy Evans will be the contractor installing this work.
ePlan: Commercial Expedited Review - [APPROVED] New Parking Garage (178517 SF).
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out for Level 1 - 5 PHASE 6 (54891 SF).
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out- 5 PHASE 1 MULTIFAMILY FLOORS 1-5 CLUB AMENTITY TO INCLUDE LEASING OFFICE LEARNING CENTER CLUBHOUSE FITNESS AND DAYCARE (82195 SF).