Construction complete ยท Nov 2020๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv

City of Fort Worth (Public Right of Way), Fort Worth, TX 76102, Fort Worth, TX, 76102

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv is a renovation/alteration project at City of Fort Worth (Public Right of Way), Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2020). The project has an estimated value of $468K across about 34,000 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2019009474
$468K
Project Value
34,000
Square Feet
$14/sqft
Cost/SqFt
1y 6mo
Duration
Registered:Apr 16, 2019
Start:Jun 1, 2019
Target:Nov 30, 2020
๐Ÿ

Project Closed

Project has been completed and closed

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv is a Renovation/Alteration project located at City of Fort Worth (Public Right of Way), Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $468K covering 34,000 sq ft. City of Fort Worth (Right of Way) Attn: Mary Hanna is the property owner and ANA Consultants, LLC is the design firm of record. The project was registered with TDLR on April 16, 2019.

โ“Frequently Asked Questions

What is FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv?

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv is a renovation/alteration project at City of Fort Worth (Public Right of Way) in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk construction and replacement, ADA ramp construction and replacement, asphalt street re-paving, curb and gutter construction and replacement, water and sanitary sewer main replacement.

Is FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv open in Fort Worth?

Construction on FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv is complete โ€” TDLR records show the project passed its required accessibility inspection in Nov 2020. The building is finished and very likely open.

Where is FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv located?

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv is located at City of Fort Worth (Public Right of Way), Fort Worth, TX, 76102, in Tarrant County.

Who is the owner or developer of FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv?

City of Fort Worth (Right of Way) Attn: Mary Hanna is the property owner/developer of record for FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv, per its TDLR project registration.

Who is the architect or design firm for FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv?

ANA Consultants, LLC is the design firm of record for FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv, according to its TDLR filing.

How much does FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv cost and how big is it?

FY17-CD9 Street Repair and Recon Program and near Southside Medical Dist W&SS Main Improv has an estimated construction value of $468K and approximately 34,000 square feet (about $14/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Sidewalk construction and replacement, ADA ramp construction and replacement, asphalt street re-paving, curb and gutter construction and replacement, water and sanitary sewer main replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 16, 2019
Project Closed
November 30, 2020
Construction Start
June 1, 2019
Expected Completion
November 30, 2020

๐Ÿ“…Project Timeline

Filed

Apr 16, 2019

Review Complete

Inspection Complete

Closed

Nov 30, 2020