Mainline Studios, Level 13
Mainline Studios, Level 13 is a renovation/alteration project at 1801 Main St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2019). The project has an estimated value of $100K across about 3,400 sq ft.
๐Project Metrics
TDLR #TABS2019010149Project Closed
Project has been completed and closed
Mainline Studios, Level 13 is a Renovation/Alteration project located at 1801 Main St, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $100K covering 3,400 sq ft. Amegy Bank is the property owner. The project was registered with TDLR on April 25, 2019.
โFrequently Asked Questions
What is Mainline Studios, Level 13?
Mainline Studios, Level 13 is a renovation/alteration project at 1801 Main St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Small renovation to existing build-out of Level 13
Is Mainline Studios, Level 13 open in Houston?
Construction on Mainline Studios, Level 13 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2019. The building is finished and very likely open.
Where is Mainline Studios, Level 13 located?
Mainline Studios, Level 13 is located at 1801 Main St, Houston, TX, 77002, in Harris County.
Who is the owner or developer of Mainline Studios, Level 13?
Amegy Bank is the property owner/developer of record for Mainline Studios, Level 13, per its TDLR project registration.
How much does Mainline Studios, Level 13 cost and how big is it?
Mainline Studios, Level 13 has an estimated construction value of $100K and approximately 3,400 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
Small renovation to existing build-out of Level 13
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 25, 2019
Review Complete
Inspection Complete
Closed
Jul 31, 2019