Verizon 2018-0087
📊Project Metrics
TDLR #TABS2019010214Review Complete
Design review complete, construction may proceed
📋Scope of Work
Interior fit-up for the tenant space in existing pad building. Demo shall include removal of suspended ceilings, ductwork, and finishes. Additionally, floor trenching which will be required for new electrical floor boxes. MEP work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Main electrical upgrade of main disconnect panel.
Express: Replace siding on the back and both sides of the house and replace two windows on the back.
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater
express remodeling kitchen remodeling bathroom updating fixtures & appliances new paint & drywall all electrical & plumbing exist just updating the fixtures & walk-in-shower