ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out
ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out is a renovation/alteration project at 6101 Highland Campus Drive Building 3000, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $13.8M across about 69,955 sq ft.
๐Project Metrics
TDLR #TABS2019010341Project Closed
Project has been completed and closed
ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out is a Renovation/Alteration project located at 6101 Highland Campus Drive Building 3000, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $13.8M covering 69,955 sq ft. Austin Community College District, Neil Vickers, EVP Finance & Administration is the property owner and Studio Steinbomer is the design firm of record. The project was registered with TDLR on April 29, 2019.
โFrequently Asked Questions
What is ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out?
ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out is a renovation/alteration project at 6101 Highland Campus Drive Building 3000 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of level one of four story building and interior finish out of new building permitted by others. Permitted in two phases.
Is ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out open in Austin?
Construction on ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out located?
ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out is located at 6101 Highland Campus Drive Building 3000, Austin, TX, 78752, in Travis County.
Who is the owner or developer of ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out?
Austin Community College District, Neil Vickers, EVP Finance & Administration is the property owner/developer of record for ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out, per its TDLR project registration.
Who is the architect or design firm for ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out?
Studio Steinbomer is the design firm of record for ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out, according to its TDLR filing.
How much does ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out cost and how big is it?
ACC Highland Campus Dillard's Building 3000 Renovation, First Floor Finish Out has an estimated construction value of $13.8M and approximately 69,955 square feet (about $197/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of level one of four story building and interior finish out of new building permitted by others. Permitted in two phases.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 29, 2019
Review Complete
Inspection Complete
Closed
Oct 29, 2021
๐Related Projects
๐คSame Owner
$30.2M total๐Related City Permits
Building permits found at or near this location
15.8 KW solar system
QT - Install shade structures at existing school - OVA
Replacement of complete existing central heat and air system with or without duct work
Tunneling under home to replace cast iron sanitary piping for kitchen and bathrooms as well as replace or repairing copper water lines as needed. **We will be tunneling approximately 810 feet beneath the home with access located in the living room adjacent to the first-floor bathroom. The existing cast iron sanitary system will be replaced with approximately 200 feet of PVC piping. In addition the existing copper water distribution system will be abandoned and replaced with PEX piping
Replace 200amp panels replacing both meters junction gutter box grounding system and surge protection for both unit A and B Electric Provider - Austin Electric