Blanco Road Phase II
Blanco Road Phase II is a renovation/alteration project at 24116 Blanco Road, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $19.2M across about 2,000,000 sq ft.
๐Project Metrics
TDLR #TABS2019010766Project Closed
Project has been completed and closed
Blanco Road Phase II is a Renovation/Alteration project located at 24116 Blanco Road, San Antonio, TX 78260 in San Antonio, Texas. The project has an estimated value of $19.2M covering 2,000,000 sq ft. Bexar County is the property owner and CP&Y Inc is the design firm of record. The project was registered with TDLR on May 2, 2019.
โFrequently Asked Questions
What is Blanco Road Phase II?
Blanco Road Phase II is a renovation/alteration project at 24116 Blanco Road in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway expansion and reconstruction of 3.2 mile segment existing 2-3 rural collector to a 4-lane divided suburban arterial with a raised median, turn lanes at certain location, bike lanes, and sidewalk.
Is Blanco Road Phase II open in San Antonio?
Construction on Blanco Road Phase II is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.
Where is Blanco Road Phase II located?
Blanco Road Phase II is located at 24116 Blanco Road, San Antonio, TX, 78260, in Bexar County.
Who is the owner or developer of Blanco Road Phase II?
Bexar County is the property owner/developer of record for Blanco Road Phase II, per its TDLR project registration.
Who is the architect or design firm for Blanco Road Phase II?
CP&Y Inc is the design firm of record for Blanco Road Phase II, according to its TDLR filing.
How much does Blanco Road Phase II cost and how big is it?
Blanco Road Phase II has an estimated construction value of $19.2M and approximately 2,000,000 square feet (about $10/sqft), based on its TDLR filing.
๐Scope of Work
Roadway expansion and reconstruction of 3.2 mile segment existing 2-3 rural collector to a 4-lane divided suburban arterial with a raised median, turn lanes at certain location, bike lanes, and sidewalk.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 2, 2019
Review Complete
Inspection Complete
Closed
Jul 1, 2021