Locked and Loaded
Locked and Loaded is a renovation/alteration project at 8050 Red Bluff, Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $110K across about 3,828 sq ft.
๐Project Metrics
TDLR #TABS2019012182Review Complete
Design review complete, construction may proceed
Locked and Loaded is a Renovation/Alteration project located at 8050 Red Bluff, Pasadena, TX 77507 in Pasadena, Texas. The project has an estimated value of $110K covering 3,828 sq ft. Dr. Carl Ball is the property owner and Sustaita Architects, Inc. is the design firm of record. The project was registered with TDLR on May 21, 2019.
โFrequently Asked Questions
What is Locked and Loaded?
Locked and Loaded is a renovation/alteration project at 8050 Red Bluff in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing building on existing site with parking improvements.
Is Locked and Loaded open in Pasadena?
Locked and Loaded is currently under construction in Pasadena, TX. Its current TDLR status is "Review Complete".
Where is Locked and Loaded located?
Locked and Loaded is located at 8050 Red Bluff, Pasadena, TX, 77507, in Harris County.
Who is the owner or developer of Locked and Loaded?
Dr. Carl Ball is the property owner/developer of record for Locked and Loaded, per its TDLR project registration.
Who is the architect or design firm for Locked and Loaded?
Sustaita Architects, Inc. is the design firm of record for Locked and Loaded, according to its TDLR filing.
How much does Locked and Loaded cost and how big is it?
Locked and Loaded has an estimated construction value of $110K and approximately 3,828 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing building on existing site with parking improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 21, 2019
Review Complete
May 21, 2019
Inspection Complete
Closed