Defee duplex
Defee duplex is a renovation/alteration project at 302 West Defee, Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 2,800 sq ft.
๐Project Metrics
TDLR #TABS2019012211Project Registered
Project has been registered with TDLR and is in pre-construction phase
Defee duplex is a Renovation/Alteration project located at 302 West Defee, Baytown, TX 77520 in Baytown, Texas. The project has an estimated value of $1.0M covering 2,800 sq ft. Hosea Lane is the property owner and Deavers E LLC is the design firm of record. The project was registered with TDLR on May 22, 2019.
โFrequently Asked Questions
What is Defee duplex?
Defee duplex is a renovation/alteration project at 302 West Defee in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: convert second level area of an existing structure into a 2 bedroom one bath duplex
Is Defee duplex open in Baytown?
Defee duplex is currently under construction in Baytown, TX. Its current TDLR status is "Project Registered".
Where is Defee duplex located?
Defee duplex is located at 302 West Defee, Baytown, TX, 77520, in Harris County.
Who is the owner or developer of Defee duplex?
Hosea Lane is the property owner/developer of record for Defee duplex, per its TDLR project registration.
Who is the architect or design firm for Defee duplex?
Deavers E LLC is the design firm of record for Defee duplex, according to its TDLR filing.
How much does Defee duplex cost and how big is it?
Defee duplex has an estimated construction value of $1.0M and approximately 2,800 square feet (about $357/sqft), based on its TDLR filing.
๐Scope of Work
convert second level area of an existing structure into a 2 bedroom one bath duplex
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 22, 2019
Review Complete
Inspection Complete
Closed