AUSTIN FAMILY DENTISTRY
AUSTIN FAMILY DENTISTRY is a renovation/alteration project at 4631 AIRPORT BLVD. SUITE 120A, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2020). The project has an estimated value of $301K across about 2,664 sq ft.
๐Project Metrics
TDLR #TABS2019014206Project Closed
Project has been completed and closed
AUSTIN FAMILY DENTISTRY is a Renovation/Alteration project located at 4631 AIRPORT BLVD. SUITE 120A, Austin, TX 78751 in Austin, Texas. The project has an estimated value of $301K covering 2,664 sq ft. HOUSTON 6000 BISSONNET, LTD is the property owner. The project was registered with TDLR on June 17, 2019.
โFrequently Asked Questions
What is AUSTIN FAMILY DENTISTRY?
AUSTIN FAMILY DENTISTRY is a renovation/alteration project at 4631 AIRPORT BLVD. SUITE 120A in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR REMODEL OF A DENTAL OFFICE
Is AUSTIN FAMILY DENTISTRY open in Austin?
Construction on AUSTIN FAMILY DENTISTRY is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2020. The building is finished and very likely open.
Where is AUSTIN FAMILY DENTISTRY located?
AUSTIN FAMILY DENTISTRY is located at 4631 AIRPORT BLVD. SUITE 120A, Austin, TX, 78751, in Travis County.
Who is the owner or developer of AUSTIN FAMILY DENTISTRY?
HOUSTON 6000 BISSONNET, LTD is the property owner/developer of record for AUSTIN FAMILY DENTISTRY, per its TDLR project registration.
How much does AUSTIN FAMILY DENTISTRY cost and how big is it?
AUSTIN FAMILY DENTISTRY has an estimated construction value of $301K and approximately 2,664 square feet (about $113/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR REMODEL OF A DENTAL OFFICE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 17, 2019
Review Complete
Inspection Complete
Closed
Jan 15, 2020
๐Related City Permits
Building permits found at or near this location
EMERGENCY REPAIR: REPLACE SERVICE CONDUCTORS STOLEN/VANDELIZED AND INSTALLING TWO GROUND RODS AT THE ELECTRICAL SERVICE BEHIND BUILDING.-HYATT
Installation of 1 non load bearing interior partition
Ricks CLEANERS wall sign
Emergency call to preform one for one replacement of faulty main breaker inside existing exterior panel utilizing all existing circuitry.
Installation of a new internally illuminated channel letter sign for Art Massage