Project has been completed and closed
Goodix Technology is a Renovation/Alteration project located at 901 S. Mopac Expressway Suite 375, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $215K covering 7,000 sq ft. HPI is the property owner and Carson Design is the design firm of record. The project was registered with TDLR on June 21, 2019.
Goodix Technology is a renovation/alteration project at 901 S. Mopac Expressway Suite 375, Austin, TX 78746 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the demolition and finish out of an existing demised tenant suite. Suite occupancy classification and use group remains unchanged by the scope of this work.
Construction on Goodix Technology is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2019. The building is finished and very likely open.
Goodix Technology is located at 901 S. Mopac Expressway Suite 375, Austin, TX 78746, Austin, TX, 78746, in Travis County.
HPI is the property owner/developer of record for Goodix Technology, per its TDLR project registration.
Carson Design is the design firm of record for Goodix Technology, according to its TDLR filing.
Goodix Technology has an estimated construction value of $215K and approximately 7,000 square feet (about $31/sqft), based on its TDLR filing.
This project consists of the demolition and finish out of an existing demised tenant suite. Suite occupancy classification and use group remains unchanged by the scope of this work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 21, 2019
Review Complete
Inspection Complete
Closed
Sep 16, 2019
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.