Firetron
Firetron is a new construction project at 2301 Double Creek Drive Suite 210, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2019). The project has an estimated value of $540K across about 11,990 sq ft.
๐Project Metrics
TDLR #TABS2019015421Project Closed
Project has been completed and closed
Firetron is a New Construction project located at 2301 Double Creek Drive Suite 210, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $540K covering 11,990 sq ft. Intrepid Equity is the property owner and McFarland Architecture is the design firm of record. The project was registered with TDLR on July 2, 2019.
โFrequently Asked Questions
What is Firetron?
Firetron is a new construction project at 2301 Double Creek Drive Suite 210 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish Out Office/Warehouse
Is Firetron open in Round Rock?
Construction on Firetron is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2019. The building is finished and very likely open.
Where is Firetron located?
Firetron is located at 2301 Double Creek Drive Suite 210, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of Firetron?
Intrepid Equity is the property owner/developer of record for Firetron, per its TDLR project registration.
Who is the architect or design firm for Firetron?
McFarland Architecture is the design firm of record for Firetron, according to its TDLR filing.
How much does Firetron cost and how big is it?
Firetron has an estimated construction value of $540K and approximately 11,990 square feet (about $45/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finish Out Office/Warehouse
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 2, 2019
Review Complete
Inspection Complete
Closed
Oct 31, 2019
๐Related Projects
๐๏ธSame Design Firm
$15.5M total๐Related City Permits
Building permits found at or near this location
upgrade Electircal underground Serivce to 200 amp
2301 E 2nd St BUILDING 2 (middle rear on E 2nd side): New construction of a 3-Story Single Family Res. [3 bed 3.5bath] and 3rd floor balcony. Part of 4-unit use 8 detached units total in development across 2 lots.
Total demo of detached garage 410 sqft circa 1959
EXPRESS: Installation of new metal panels over existing 1-layer of shingles. Installation to include fastening purlins over top of shingles then fastening metal panels to purlins.
Irrigation system
Property Owner
Design Firm
Registered Accessibility Specialist
Tenant
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson