Final inspection completed, awaiting project closure
West Park PUD Phase Three (civil review only) is a New Construction project located at 7870 W US 290 Hwy, Austin, TX 78736 in Austin, Texas. The project has an estimated value of $2.9M covering 335,000 sq ft. IMP YAUPON LLC is the property owner and LJA Engineering Inc is the design firm of record. The project was registered with TDLR on July 9, 2019.
civil plan review only. Proposed apartment development with 300 dwelling units over 10 buildings and associated site improvements including accessory buildings, parking, drainage and utility improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 9, 2019
Review Complete
Inspection Complete
May 15, 2021
Closed
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton horizontal gas system
I am rerouting a new sewer for the pool building because existing sewer line is unable to be dug up and repaired. This is for an apartment complex an
Repair collapsed sewer YARDLINE in backyard
200amp stand alone electric service for Spectrum CATV power supply enclosure. Located within the Yaupon Apts & 7870 US 290 W
ePlan: Expedited Review - New Construction of a Carport
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis