Cinemark
Cinemark is a renovation/alteration project at 15436 1/2 FM1825, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2019). The project has an estimated value of $2.1M across about 3,620 sq ft.
๐Project Metrics
TDLR #TABS2019016146Project Closed
Project has been completed and closed
Cinemark is a Renovation/Alteration project located at 15436 1/2 FM1825, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $2.1M covering 3,620 sq ft. EPT 909, Inc. is the property owner. The project was registered with TDLR on July 15, 2019.
โFrequently Asked Questions
What is Cinemark?
Cinemark is a renovation/alteration project at 15436 1/2 FM1825 in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodeling of restrooms at this theater. This includes new finishes, alterations to the partitions and fixture layouts.
Is Cinemark open in Pflugerville?
Construction on Cinemark is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2019. The building is finished and very likely open.
Where is Cinemark located?
Cinemark is located at 15436 1/2 FM1825, Pflugerville, TX, 78660, in Travis County.
Who is the owner or developer of Cinemark?
EPT 909, Inc. is the property owner/developer of record for Cinemark, per its TDLR project registration.
How much does Cinemark cost and how big is it?
Cinemark has an estimated construction value of $2.1M and approximately 3,620 square feet (about $582/sqft), based on its TDLR filing.
๐Scope of Work
Remodeling of restrooms at this theater. This includes new finishes, alterations to the partitions and fixture layouts.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 15, 2019
Review Complete
Inspection Complete
Closed
Nov 29, 2019
๐Related Projects
๐คSame Owner
$10.7M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work UP AND DOWN
Install (2) Volta L2 media stations and all related electrical and civil activities painting and marking of EV charging parking spaces and installation of necessary parking signs
Install (2) Volta L2 media stations and all related electrical and civil activities painting and marking of EV charging parking spaces and installation of necessary parking signs
Interior remodel to existing Movie Theater to upgrade seats.