Tom Thumb 2581
Tom Thumb 2581 is a renovation/alteration project at 4848 Preston Rd., Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $400K across about 63,000 sq ft.
๐Project Metrics
TDLR #TABS2019016356Project Closed
Project has been completed and closed
Tom Thumb 2581 is a Renovation/Alteration project located at 4848 Preston Rd., Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $400K covering 63,000 sq ft. Albertsons is the property owner and PM Design Group is the design firm of record. The project was registered with TDLR on July 17, 2019.
โFrequently Asked Questions
What is Tom Thumb 2581?
Tom Thumb 2581 is a renovation/alteration project at 4848 Preston Rd. in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove/Replace food cases, Remove/Replace Checkout stands
Is Tom Thumb 2581 open in Frisco?
Construction on Tom Thumb 2581 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is Tom Thumb 2581 located?
Tom Thumb 2581 is located at 4848 Preston Rd., Frisco, TX, 75034, in Collin County.
Who is the owner or developer of Tom Thumb 2581?
Albertsons is the property owner/developer of record for Tom Thumb 2581, per its TDLR project registration.
Who is the architect or design firm for Tom Thumb 2581?
PM Design Group is the design firm of record for Tom Thumb 2581, according to its TDLR filing.
How much does Tom Thumb 2581 cost and how big is it?
Tom Thumb 2581 has an estimated construction value of $400K and approximately 63,000 square feet (about $6/sqft), based on its TDLR filing.
๐Scope of Work
Remove/Replace food cases, Remove/Replace Checkout stands
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 17, 2019
Review Complete
Inspection Complete
Closed
Aug 30, 2019