A1932904 KFORCE is a renovation/alteration project at 901 S Mopac Expressway, Suite 250, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2019). The project has an estimated value of $190K across about 3,916 sq ft.
Project has been completed and closed
A1932904 KFORCE is a Renovation/Alteration project located at 901 S Mopac Expressway, Suite 250, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $190K covering 3,916 sq ft. Amelia Stuerzenberger is the property owner and Carson Design Associates is the design firm of record. The project was registered with TDLR on July 17, 2019.
A1932904 KFORCE is a renovation/alteration project at 901 S Mopac Expressway, Suite 250 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the demolition and finish out of an new demised tenant suite.
Construction on A1932904 KFORCE is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2019. The building is finished and very likely open.
A1932904 KFORCE is located at 901 S Mopac Expressway, Suite 250, Austin, TX, 78746, in Travis County.
Amelia Stuerzenberger is the property owner/developer of record for A1932904 KFORCE, per its TDLR project registration.
Carson Design Associates is the design firm of record for A1932904 KFORCE, according to its TDLR filing.
A1932904 KFORCE has an estimated construction value of $190K and approximately 3,916 square feet (about $49/sqft), based on its TDLR filing.
This project consists of the demolition and finish out of an new demised tenant suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 17, 2019
Review Complete
Inspection Complete
Closed
Sep 30, 2019
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.