A1932904 KFORCE
๐Project Metrics
TDLR #TABS2019016359Project Closed
Project has been completed and closed
๐Scope of Work
This project consists of the demolition and finish out of an new demised tenant suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$881K total๐๏ธSame Design Firm
$1.4M total๐Related City Permits
Building permits found at or near this location
ePlan: Residential Expedited Review - Addition and Remodel to create new 2-story+basement-level duplex from existing 2-Story Single Family Res. New basement-level unit (Unit B) is added in existing basement crawl space & has 2 bedroom 3 bathroom additional bathroom for unit A (existing unit) is added in basement level.
Replacement of mini-split system St David *This is a separate job not related to anything existing. The mini split is located on the 2nd floor central by AHUs 2&3. It serves the fire control room.
Interior Remodel Existing Lobby Areas in Hospital
150-amp overhead service rebuild
Excavate 20 Tunnel to repair main drain line under house Excavate 35 trench to repair main drain line under yard