Dynamic Glass Offices Tenant Fit-Out
📊Project Metrics
TDLR #TABS2019016486Project Closed
Project has been completed and closed
📋Scope of Work
Tenant space build-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 9-CB-L. This is a 2 Story building with height of 31-7 and 3129 square feet.
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 5-BA-L. This is a 2 Story building 3 beds 3.5 baths with height of 33-4 and 3144 square feet.
Replacement of complete existing central heat and air system with or without duct work HVAC changeout/alteration; Replace existing 5-ton heat pump system with like-for-like equipment; No structural change.
New Construction Electrical 1800 sq. ft. ETJ
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 3-AB-L. This is a 2 Story building with height of 30-9 and 3600 square feet.