600 W 5th
600 W 5th is a new construction project at 600 W 5th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $46.0M across about 262,000 sq ft.
๐Project Metrics
TDLR #TABS2019018629Project Closed
Project has been completed and closed
600 W 5th is a New Construction project located at 600 W 5th Street, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $46.0M covering 262,000 sq ft. Horizon Bank is the property owner and Beck Architecture LLC is the design firm of record. The project was registered with TDLR on August 16, 2019.
โFrequently Asked Questions
What is 600 W 5th?
600 W 5th is a new construction project at 600 W 5th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 16 story core and shell office building with parking garage
Is 600 W 5th open in Austin?
Construction on 600 W 5th is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is 600 W 5th located?
600 W 5th is located at 600 W 5th Street, Austin, TX, 78701, in Travis County.
Who is the owner or developer of 600 W 5th?
Horizon Bank is the property owner/developer of record for 600 W 5th, per its TDLR project registration.
Who is the architect or design firm for 600 W 5th?
Beck Architecture LLC is the design firm of record for 600 W 5th, according to its TDLR filing.
How much does 600 W 5th cost and how big is it?
600 W 5th has an estimated construction value of $46.0M and approximately 262,000 square feet (about $176/sqft), based on its TDLR filing.
๐Scope of Work
16 story core and shell office building with parking garage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 16, 2019
Review Complete
Inspection Complete
Closed
May 31, 2023
๐Related Projects
๐คSame Owner
$10.2M total๐Related City Permits
Building permits found at or near this location
Installing the kitchen lights. Will be removing the florescent lights and installing 5 recessed lights on that switch. Then adding 2 hanging lights to a different switch that already controls the light over the sink.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Vertical Gas
Add car charger
Replace existing cast-iron sanitary sewer piping beneath the residence via tunneling. Also replace approximately 10 feet of sewer piping to correct an existing belly
Property Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis