Level 7 Corridor
Level 7 Corridor is a renovation/alteration project at 480 Wildwood Forest, Spring, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $150K across about 1,724 sq ft.
๐Project Metrics
TDLR #TABS2019018679Project Closed
Project has been completed and closed
Level 7 Corridor is a Renovation/Alteration project located at 480 Wildwood Forest, Spring, TX 77380 in Spring, Texas. The project has an estimated value of $150K covering 1,724 sq ft. GeoSouthern Budde LLC is the property owner and Lamoureux Associates Inc is the design firm of record. The project was registered with TDLR on August 19, 2019.
โFrequently Asked Questions
What is Level 7 Corridor?
Level 7 Corridor is a renovation/alteration project at 480 Wildwood Forest in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel corridor
Is Level 7 Corridor open in Spring?
Construction on Level 7 Corridor is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is Level 7 Corridor located?
Level 7 Corridor is located at 480 Wildwood Forest, Spring, TX, 77380, in Montgomery County.
Who is the owner or developer of Level 7 Corridor?
GeoSouthern Budde LLC is the property owner/developer of record for Level 7 Corridor, per its TDLR project registration.
Who is the architect or design firm for Level 7 Corridor?
Lamoureux Associates Inc is the design firm of record for Level 7 Corridor, according to its TDLR filing.
How much does Level 7 Corridor cost and how big is it?
Level 7 Corridor has an estimated construction value of $150K and approximately 1,724 square feet (about $87/sqft), based on its TDLR filing.
๐Scope of Work
remodel corridor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 19, 2019
Review Complete
Inspection Complete
Closed
Dec 31, 2019