Suite 800 TI
Suite 800 TI is a renovation/alteration project at 500 West Illinois Ave, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $360K across about 7,705 sq ft.
๐Project Metrics
TDLR #TABS2019018818Project Closed
Project has been completed and closed
Suite 800 TI is a Renovation/Alteration project located at 500 West Illinois Ave, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $360K covering 7,705 sq ft. Mark Kaufman is the property owner and JM Drafting & Design is the design firm of record. The project was registered with TDLR on August 20, 2019.
โFrequently Asked Questions
What is Suite 800 TI?
Suite 800 TI is a renovation/alteration project at 500 West Illinois Ave in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office lease space.
Is Suite 800 TI open in Midland?
Construction on Suite 800 TI is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is Suite 800 TI located?
Suite 800 TI is located at 500 West Illinois Ave, Midland, TX, 79701, in Midland County.
Who is the owner or developer of Suite 800 TI?
Mark Kaufman is the property owner/developer of record for Suite 800 TI, per its TDLR project registration.
Who is the architect or design firm for Suite 800 TI?
JM Drafting & Design is the design firm of record for Suite 800 TI, according to its TDLR filing.
How much does Suite 800 TI cost and how big is it?
Suite 800 TI has an estimated construction value of $360K and approximately 7,705 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing office lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 20, 2019
Review Complete
Inspection Complete
Closed
Dec 1, 2019