Bedesign
Bedesign is a additions to existing building project at 2016 W. Alabama, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 10,100 sq ft.
๐Project Metrics
TDLR #TABS2020000222Review Complete
Design review complete, construction may proceed
Bedesign is a Additions to Existing Building project located at 2016 W. Alabama, Houston, TX 77098 in Houston, Texas. The project has an estimated value of $1.0M covering 10,100 sq ft. Adrian Duenas is the property owner and Loaded Design Services is the design firm of record. The project was registered with TDLR on September 4, 2019.
โFrequently Asked Questions
What is Bedesign?
Bedesign is a additions to existing building project at 2016 W. Alabama in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 10,100 SF showroom addition to existing building
Is Bedesign open in Houston?
Bedesign is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is Bedesign located?
Bedesign is located at 2016 W. Alabama, Houston, TX, 77098, in Harris County.
Who is the owner or developer of Bedesign?
Adrian Duenas is the property owner/developer of record for Bedesign, per its TDLR project registration.
Who is the architect or design firm for Bedesign?
Loaded Design Services is the design firm of record for Bedesign, according to its TDLR filing.
How much does Bedesign cost and how big is it?
Bedesign has an estimated construction value of $1.0M and approximately 10,100 square feet (about $99/sqft), based on its TDLR filing.
๐Scope of Work
New 10,100 SF showroom addition to existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 4, 2019
Review Complete
Sep 4, 2019
Inspection Complete
Closed