Project has been completed and closed
BRIGGS & VESELKA AUSTIN - PHASE 2 is a Renovation/Alteration project located at 901 SOUTH MOPAC EXPY SUITE 450, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $560K covering 7,260 sq ft. HPI Real Estate is the property owner and ZIEGLER COOPER ARCHITECTS is the design firm of record. The project was registered with TDLR on September 23, 2019.
BRIGGS & VESELKA AUSTIN - PHASE 2 is a renovation/alteration project at 901 SOUTH MOPAC EXPY SUITE 450, Austin, TX 78746 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR RENOVATION OF EXISTING OFFICE BUILD OUT
Construction on BRIGGS & VESELKA AUSTIN - PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2020. The building is finished and very likely open.
BRIGGS & VESELKA AUSTIN - PHASE 2 is located at 901 SOUTH MOPAC EXPY SUITE 450, Austin, TX 78746, Austin, TX, 78746, in Travis County.
HPI Real Estate is the property owner/developer of record for BRIGGS & VESELKA AUSTIN - PHASE 2, per its TDLR project registration.
ZIEGLER COOPER ARCHITECTS is the design firm of record for BRIGGS & VESELKA AUSTIN - PHASE 2, according to its TDLR filing.
BRIGGS & VESELKA AUSTIN - PHASE 2 has an estimated construction value of $560K and approximately 7,260 square feet (about $77/sqft), based on its TDLR filing.
INTERIOR RENOVATION OF EXISTING OFFICE BUILD OUT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 23, 2019
Review Complete
Inspection Complete
Closed
Feb 7, 2020
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.