Standard Supply
Standard Supply is a renovation/alteration project at 1216 Bennett Ave., Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2020). The project has an estimated value of $125K across about 20,937 sq ft.
๐Project Metrics
TDLR #TABS2020001531Project Closed
Project has been completed and closed
Standard Supply is a Renovation/Alteration project located at 1216 Bennett Ave., Tyler, TX 75701 in Tyler, Texas. The project has an estimated value of $125K covering 20,937 sq ft. Drake Candy Park, LLC is the property owner and Thompson Architectural Group is the design firm of record. The project was registered with TDLR on September 24, 2019.
โFrequently Asked Questions
What is Standard Supply?
Standard Supply is a renovation/alteration project at 1216 Bennett Ave. in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing metal building.
Is Standard Supply open in Tyler?
Construction on Standard Supply is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2020. The building is finished and very likely open.
Where is Standard Supply located?
Standard Supply is located at 1216 Bennett Ave., Tyler, TX, 75701, in Smith County.
Who is the owner or developer of Standard Supply?
Drake Candy Park, LLC is the property owner/developer of record for Standard Supply, per its TDLR project registration.
Who is the architect or design firm for Standard Supply?
Thompson Architectural Group is the design firm of record for Standard Supply, according to its TDLR filing.
How much does Standard Supply cost and how big is it?
Standard Supply has an estimated construction value of $125K and approximately 20,937 square feet (about $6/sqft), based on its TDLR filing.
๐Scope of Work
Remodel existing metal building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 24, 2019
Review Complete
Inspection Complete
Closed
Jan 10, 2020