Bryson Phase 11 Section 1
๐Project Metrics
TDLR #TABS2020002275Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Water, wastewater, drainage, and paving improvements for a single family subdivision.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$9.9M total๐Related City Permits
Building permits found at or near this location
Change the Accessory Use in Rooms 226-229 from Day Care Services back to the previous flexible assembly space. No work proposed
Replacement of any self-contained packaged units Replacement of 3x RTUs at Kramer 2 Building B Suite 100
Replacement of any self-contained packaged units Replacement of 1x 7.5 Ton RTU (We have changed out multiple units at this location in the past. This is not a duplicate permit request)
Rooftop Solar with Line Side Tap Interconnection
Rooftop Solar with Line Side Tap Interconnection.