Centre at River Oaks Phase 1 is a renovation/alteration project at 3029 Kirby Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2020). The project has an estimated value of $90K across about 6,879 sq ft.
Project has been completed and closed
Centre at River Oaks Phase 1 is a Renovation/Alteration project located at 3029 Kirby Drive, Houston, TX 77098 in Houston, Texas. The project has an estimated value of $90K covering 6,879 sq ft. Ainbinder Co, LLC is the property owner and Boucher Design Group is the design firm of record. The project was registered with TDLR on October 14, 2019.
Centre at River Oaks Phase 1 is a renovation/alteration project at 3029 Kirby Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Subdivide existing space with new demising walls and shared access corridor. Provide MEP to the individual spaces
Construction on Centre at River Oaks Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2020. The building is finished and very likely open.
Centre at River Oaks Phase 1 is located at 3029 Kirby Drive, Houston, TX, 77098, in Harris County.
Ainbinder Co, LLC is the property owner/developer of record for Centre at River Oaks Phase 1, per its TDLR project registration.
Boucher Design Group is the design firm of record for Centre at River Oaks Phase 1, according to its TDLR filing.
Centre at River Oaks Phase 1 has an estimated construction value of $90K and approximately 6,879 square feet (about $13/sqft), based on its TDLR filing.
Subdivide existing space with new demising walls and shared access corridor. Provide MEP to the individual spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 14, 2019
Review Complete
Inspection Complete
Closed
Jan 3, 2020