Project has been completed and closed
Albertson's - El Rancho Finish Out is a Renovation/Alteration project located at 10020 Marsh Lane, SUITE 300, Dallas, TX 75254 in Dallas, Texas. The project has an estimated value of $3.3M covering 29,853 sq ft. HOPKINS WALNUT HILL PLAZA LTD is the property owner and HEIGHTS VENTURE ARCHITECTURE is the design firm of record. The project was registered with TDLR on December 20, 2019.
Albertson's - El Rancho Finish Out is a renovation/alteration project at 10020 Marsh Lane, SUITE 300, Dallas, TX 75254 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repair of existing building interior. Scope of work to primarily consist of repairing, patching, and replacing damaged walls for tenant's finish-out, white box, only, due to damage by tornado.
Construction on Albertson's - El Rancho Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2020. The building is finished and very likely open.
Albertson's - El Rancho Finish Out is located at 10020 Marsh Lane, SUITE 300, Dallas, TX 75254, Dallas, TX, 75254, in Dallas County.
HOPKINS WALNUT HILL PLAZA LTD is the property owner/developer of record for Albertson's - El Rancho Finish Out, per its TDLR project registration.
HEIGHTS VENTURE ARCHITECTURE is the design firm of record for Albertson's - El Rancho Finish Out, according to its TDLR filing.
Albertson's - El Rancho Finish Out has an estimated construction value of $3.3M and approximately 29,853 square feet (about $110/sqft), based on its TDLR filing.
Repair of existing building interior. Scope of work to primarily consist of repairing, patching, and replacing damaged walls for tenant's finish-out, white box, only, due to damage by tornado.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 20, 2019
Review Complete
Inspection Complete
Closed
Dec 31, 2020