Steward
Steward is a renovation/alteration project at 807 Las Cimas Parkway Suite 325, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2020). The project has an estimated value of $260K across about 5,687 sq ft.
๐Project Metrics
TDLR #TABS2020007980Project Closed
Project has been completed and closed
Steward is a Renovation/Alteration project located at 807 Las Cimas Parkway Suite 325, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $260K covering 5,687 sq ft. Cushman & Wakefield is the property owner and JDAI Studio is the design firm of record. The project was registered with TDLR on December 20, 2019.
โFrequently Asked Questions
What is Steward?
Steward is a renovation/alteration project at 807 Las Cimas Parkway Suite 325 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of existing office space to new offices space
Is Steward open in Austin?
Construction on Steward is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2020. The building is finished and very likely open.
Where is Steward located?
Steward is located at 807 Las Cimas Parkway Suite 325, Austin, TX, 78746, in Travis County.
Who is the owner or developer of Steward?
Cushman & Wakefield is the property owner/developer of record for Steward, per its TDLR project registration.
Who is the architect or design firm for Steward?
JDAI Studio is the design firm of record for Steward, according to its TDLR filing.
How much does Steward cost and how big is it?
Steward has an estimated construction value of $260K and approximately 5,687 square feet (about $46/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of existing office space to new offices space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2019
Review Complete
Inspection Complete
Closed
Mar 30, 2020
๐Related Projects
๐คSame Owner
$98.6M total๐Related City Permits
Building permits found at or near this location
Express: siding replacement around exterior and behind electrical box
Express: Replace 3 windows like for like
Express: siding replacement around exterior and behind electrical box
Installation of new 200a overhead riser 200R Meter can and 200a Main Breaker Panel - Remove existing aged equipment
25 trench for sewer line replacement from right side of home to city tap.