Travis Co WCID 10 Pump Station 3 Phase 2 is a new construction project at 5324 Bee Cave Road, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $4.0M across about 3,000 sq ft.
Project has been completed and closed
Travis Co WCID 10 Pump Station 3 Phase 2 is a New Construction project located at 5324 Bee Cave Road, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $4.0M covering 3,000 sq ft. Travis County WCID 10 is the property owner and Dannenbaum Engineering is the design firm of record. The project was registered with TDLR on January 9, 2020.
Travis Co WCID 10 Pump Station 3 Phase 2 is a new construction project at 5324 Bee Cave Road in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New pump station facility with parking and perimeter sidewalk
Construction on Travis Co WCID 10 Pump Station 3 Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
Travis Co WCID 10 Pump Station 3 Phase 2 is located at 5324 Bee Cave Road, Austin, TX, 78746, in Travis County.
Travis County WCID 10 is the property owner/developer of record for Travis Co WCID 10 Pump Station 3 Phase 2, per its TDLR project registration.
Dannenbaum Engineering is the design firm of record for Travis Co WCID 10 Pump Station 3 Phase 2, according to its TDLR filing.
Travis Co WCID 10 Pump Station 3 Phase 2 has an estimated construction value of $4.0M and approximately 3,000 square feet (about $1.33K/sqft), based on its TDLR filing.
New pump station facility with parking and perimeter sidewalk
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 9, 2020
Review Complete
Inspection Complete
Closed
Dec 1, 2021
Building permits found at or near this location
EXPRESS: Replacing 1 window and 1 door like for like
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
**Reference 2025-025534 BP** Provide and install temporary 200-amp single-phase power pole for construction use. Includes meter base main breaker weatherproof receptacles grounding and installation to meet City of Austin and NEC 2023 requirements. Service to be energized after passing inspection by the Authority Having Jurisdiction (AHJ) and Austin Energy connection.
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis