Cox Automotive
Cox Automotive is a renovation/alteration project at 10415 Morado Circle, Building 3 Suite 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 5,114 sq ft.
๐Project Metrics
TDLR #TABS2020012920Project Registered
Project has been registered with TDLR and is in pre-construction phase
Cox Automotive is a Renovation/Alteration project located at 10415 Morado Circle, Building 3 Suite 100, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $1.0M covering 5,114 sq ft. Vanderbilt Office Properties is the property owner. The project was registered with TDLR on March 4, 2020.
โFrequently Asked Questions
What is Cox Automotive?
Cox Automotive is a renovation/alteration project at 10415 Morado Circle, Building 3 Suite 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial Renovation of the 1st Floor including dmeolition of walls, ceiling, power and communications and finishes. New walls, doors, ceiling, ceiling grid and tile, power and communication devices, finishes, millwork and lighting.
Is Cox Automotive open in Austin?
Cox Automotive is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Where is Cox Automotive located?
Cox Automotive is located at 10415 Morado Circle, Building 3 Suite 100, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Cox Automotive?
Vanderbilt Office Properties is the property owner/developer of record for Cox Automotive, per its TDLR project registration.
How much does Cox Automotive cost and how big is it?
Cox Automotive has an estimated construction value of $1.0M and approximately 5,114 square feet (about $196/sqft), based on its TDLR filing.
๐Scope of Work
Partial Renovation of the 1st Floor including dmeolition of walls, ceiling, power and communications and finishes. New walls, doors, ceiling, ceiling grid and tile, power and communication devices, finishes, millwork and lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2020
Review Complete
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
7 DAY - interior remodel of existing office space. no access control. - OVA
Replacement of complete existing central heat and air system with or without duct work
Building Sewer (yard line): Replacing 50 feet starting at the edge of the house and ends at the edge of the sidewalk at the front of the house
Replacement of an existing water heater Change Out: Install/ Replace 40 gallon tank-type natural gas water heater.
Install 16 (405W) roof mounted solar panels 6.480 kW solar service system tying into new 200 AMP rated MSP