Weed Corley Fish at Parkcrest
๐Project Metrics
TDLR #TABS2020013116Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Renovation and addition to existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Excavate an access hole on perimeter of slab. Tunnel roughly 20 feet to shower tie in. Repair shower tie in and damaged section of cast iron mainline. Support and hang all new lines to the slab with the use of clevis hangers. Have line inspected by city. Backfill tunnel with required engineers report.
replace tankless water heater
Emergency replacement of 70 amp main breaker disconnect & added surge protection. ***Emergency inspection done on 5/21/25. No meter work/no ESPA required-Hyatt***
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Tue 6/21/2022 @ 8am V
๐Related Site Plans
City of Austin site plan approvals at this location