๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Ascenscion Seton-Dripping Springs

249 Sportsplex Dr. Suite 200, Dripping Springs, TX 78620, Dripping Springs, TX, 78620
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2020013869
$350K
Project Value
5,212
Square Feet
$67/sqft
Cost/SqFt
7 months
Duration
Registered:Mar 17, 2020
Start:Apr 6, 2020
Target:Nov 1, 2020
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

Fit out shell space of newly constructed building. Work to include wall framing, gypsum drywall work, electrical, plumbing, millwork, ceiling and finishes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 17, 2020
Construction Start
April 6, 2020
Expected Completion
November 1, 2020

๐Ÿ“Location & Views

Open in MapsGet Directions|30.19488, -98.09637

๐Ÿ“„Related City Permits

Building permits found at or near this location

2499-1/2 S CAPITAL OF TEXAS HIGHWAY
17.41 mi away

Provide temp power for 2499 S Capital of TX Hwy NB B service upgrade. 2023-133083 EP 2023-119305 PR Take service off existing metering and put on temp power while upgrading/updating existing electrical service.

ActiveElectrical PermitTemporary LoopJun 2024
View Details
2023-138108 EP
๐Ÿ”งKraatz Electric
2499 S CAPITAL OF TEXAS HWY NB
17.42 mi away

Replace one of two sub panels on the exterior of the building that supplies power to condensing units for air conditioning. Also replace branch circuit conduits and wire from both sub panels to the condensing units. Adding a 120V 20A GFCI circuit and receptacle within 25 feet of all condensing units.

FinalElectrical PermitRepairMar 2025
View Details
2025-010719 EP
๐Ÿ”งKraatz Electric
2499 S CAPITAL OF TEXAS HWY NB BLDG B
17.42 mi away

Replace two existing 125A sub panels on the exterior of the building that supply power to condensing units for air conditioning. Also replace feeder and branch circuit conduits and wire from sub panels to condensing units. Add 120V 20A GFCI circuit and receptacles within 25 feet of all condensing units.

FinalElectrical PermitRepairMar 2025
View Details
2025-010735 EP
๐Ÿ”งKraatz Electric
2499 S CAPITAL OF TEXAS HWY NB BLDG B
17.42 mi away

All OCP staying same size Old equipment is fusible- Replace with breakers and new gutters b/c current are rusty small & hard **Electrical only scope to rebuild an existing service- No Building Permit is required**

FinalElectrical PermitUpgradeOct 2023
View Details
2023-133083 EP
๐Ÿ”งKraatz Electric
2495 WAYMAKER WAY
19.45 mi away

Install new 17.9kW rooftop solar system for existing residential only.

FinalElectrical PermitAuxiliary PowerJul 2023
View Details
2023-083639 EP
๐Ÿ”งFreedom Solar Power