1915 MISD Kimbrough MS Gym, Addition
1915 MISD Kimbrough MS Gym, Addition is a additions to existing building project at 3900 N Galloway Ave, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $6.0M across about 13,500 sq ft.
๐Project Metrics
TDLR #TABS2020014580Project Closed
Project has been completed and closed
1915 MISD Kimbrough MS Gym, Addition is a Additions to Existing Building project located at 3900 N Galloway Ave, Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $6.0M covering 13,500 sq ft. Mesquite ISD- Don Pool is the property owner and WRA Architects, Inc is the design firm of record. The project was registered with TDLR on March 28, 2020.
โFrequently Asked Questions
What is 1915 MISD Kimbrough MS Gym, Addition?
1915 MISD Kimbrough MS Gym, Addition is a additions to existing building project at 3900 N Galloway Ave in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: he proposed project is comprised of new Gymnasium Addition.
Is 1915 MISD Kimbrough MS Gym, Addition open in Mesquite?
Construction on 1915 MISD Kimbrough MS Gym, Addition is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.
Where is 1915 MISD Kimbrough MS Gym, Addition located?
1915 MISD Kimbrough MS Gym, Addition is located at 3900 N Galloway Ave, Mesquite, TX, 75150, in Dallas County.
Who is the owner or developer of 1915 MISD Kimbrough MS Gym, Addition?
Mesquite ISD- Don Pool is the property owner/developer of record for 1915 MISD Kimbrough MS Gym, Addition, per its TDLR project registration.
Who is the architect or design firm for 1915 MISD Kimbrough MS Gym, Addition?
WRA Architects, Inc is the design firm of record for 1915 MISD Kimbrough MS Gym, Addition, according to its TDLR filing.
How much does 1915 MISD Kimbrough MS Gym, Addition cost and how big is it?
1915 MISD Kimbrough MS Gym, Addition has an estimated construction value of $6.0M and approximately 13,500 square feet (about $444/sqft), based on its TDLR filing.
๐Scope of Work
he proposed project is comprised of new Gymnasium Addition.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 28, 2020
Review Complete
Inspection Complete
Closed
Jul 24, 2021