Waterloo Swimming
๐Project Metrics
TDLR #TABS2020014828Review Complete
Design review complete, construction may proceed
๐Scope of Work
interior renovation of existing building to build a swim center with 2 indoor pools
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
express - renovation of half bath utility upgrade for mudroom REVISION: Add MP 12/16/25 SM - REVISED: Original utility room to convert to a new powder bath. Upstairs attic space being converted into a utility room. New kitchen island and cosmetic upgrades to finishes.
Addition and interior remodel: 1st floor addition (479 sqft) adding new covered patio & pergola new front porch. Existing bedrooms and bathrooms to remain. 2/6/2024: Revision to extend front porch clerestory at living room bay windows at kitchen and bedroom 1. Reconfiguration of overall roof pitch and back porch roof and addition of deck instead of concrete flatwork.
Total Demo of SFR 812 sq ft circa 1939 Total Demo of Detached Garage 324 sq ft ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Total Demo of SFR 812 sq ft circa 1939 Total Demo of Detached Garage 324 sq ft ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Service upgrade and indoor panel replacement
๐Related Site Plans
City of Austin site plan approvals at this location