Specialty Clinic of is a additions to existing building project at 2217 Park Bend Drive Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $700K across about 13,600 sq ft.
Project has been completed and closed
Specialty Clinic of is a Additions to Existing Building project located at 2217 Park Bend Drive Suite 300, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $700K covering 13,600 sq ft. Jessica Ramirez is the property owner and Polkinghorn Group Architects is the design firm of record. The project was registered with TDLR on April 7, 2020.
Specialty Clinic of is a additions to existing building project at 2217 Park Bend Drive Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 13,600 square foot out patient clinic. The scope of work includes doctors offices, staff and public restrooms, exam rooms, lobby, and break room.
Construction on Specialty Clinic of is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.
Specialty Clinic of is located at 2217 Park Bend Drive Suite 300, Austin, TX, 78758, in Travis County.
Jessica Ramirez is the property owner/developer of record for Specialty Clinic of, per its TDLR project registration.
Polkinghorn Group Architects is the design firm of record for Specialty Clinic of, according to its TDLR filing.
Specialty Clinic of has an estimated construction value of $700K and approximately 13,600 square feet (about $51/sqft), based on its TDLR filing.
13,600 square foot out patient clinic. The scope of work includes doctors offices, staff and public restrooms, exam rooms, lobby, and break room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 7, 2020
Review Complete
Inspection Complete
Closed
Sep 1, 2020
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Install new 2-Ton Goodman 14.3-SEER Electric AC & 96% Gas Heating System
Replacement of an existing water heater
150AMP SERVICE UPGRADE
Replacing Like/Like E water Heater
Installing disconnect for E water heater