DRW is a renovation/alteration project at 300 WEST 6TH STREET, SUITE 2300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2020). The project has an estimated value of $4.5M across about 15,576 sq ft.
๐Project Metrics
TDLR #TABS2020016345Project Closed
Project has been completed and closed
DRW is a Renovation/Alteration project located at 300 WEST 6TH STREET, SUITE 2300, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $4.5M covering 15,576 sq ft. ENDEAVOR REAL ESTATE GROUP LTD is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on April 28, 2020.
โFrequently Asked Questions
What is DRW?
DRW is a renovation/alteration project at 300 WEST 6TH STREET, SUITE 2300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR RENOVATION OF EXISTING OFFICE SPACE
Is DRW open in Austin?
Construction on DRW is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2020. The building is finished and very likely open.
Where is DRW located?
DRW is located at 300 WEST 6TH STREET, SUITE 2300, Austin, TX, 78701, in Travis County.
Who is the owner or developer of DRW?
ENDEAVOR REAL ESTATE GROUP LTD is the property owner/developer of record for DRW, per its TDLR project registration.
Who is the architect or design firm for DRW?
ABEL DESIGN GROUP is the design firm of record for DRW, according to its TDLR filing.
How much does DRW cost and how big is it?
DRW has an estimated construction value of $4.5M and approximately 15,576 square feet (about $289/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR RENOVATION OF EXISTING OFFICE SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 28, 2020
Review Complete
Inspection Complete
Closed
Nov 11, 2020
๐Related Projects
๐๏ธSame Design Firm
$504.3M total๐Related City Permits
Building permits found at or near this location
Repair gas leak behind stove.
ePlan: Commercial Expedited Review - Interior and Exterior Remodel to Existing Fraternity House on UT Campus (12000 SF)
New construction in-ground pool.
New construction in-ground pool.
hbl