ITRON 3RD FLOOR EXPANSION
ITRON 3RD FLOOR EXPANSION is a renovation/alteration project at 1250 S. CAPTIAL OF TEXAS HIGHWAY BLDG 3 SUITE 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $1.1M across about 14,431 sq ft.
๐Project Metrics
TDLR #TABS2020016827Project Closed
Project has been completed and closed
ITRON 3RD FLOOR EXPANSION is a Renovation/Alteration project located at 1250 S. CAPTIAL OF TEXAS HIGHWAY BLDG 3 SUITE 300, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $1.1M covering 14,431 sq ft. ENDEAVOR REAL ESTATE GROUP is the property owner. The project was registered with TDLR on May 5, 2020.
โFrequently Asked Questions
What is ITRON 3RD FLOOR EXPANSION?
ITRON 3RD FLOOR EXPANSION is a renovation/alteration project at 1250 S. CAPTIAL OF TEXAS HIGHWAY BLDG 3 SUITE 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior alteration of existing 3rd floor tenant to occupy 3rd floor of bldg. 3. Approx 14,431sf of interior alteration
Is ITRON 3RD FLOOR EXPANSION open in Austin?
Construction on ITRON 3RD FLOOR EXPANSION is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
Where is ITRON 3RD FLOOR EXPANSION located?
ITRON 3RD FLOOR EXPANSION is located at 1250 S. CAPTIAL OF TEXAS HIGHWAY BLDG 3 SUITE 300, Austin, TX, 78746, in Travis County.
Who is the owner or developer of ITRON 3RD FLOOR EXPANSION?
ENDEAVOR REAL ESTATE GROUP is the property owner/developer of record for ITRON 3RD FLOOR EXPANSION, per its TDLR project registration.
How much does ITRON 3RD FLOOR EXPANSION cost and how big is it?
ITRON 3RD FLOOR EXPANSION has an estimated construction value of $1.1M and approximately 14,431 square feet (about $76/sqft), based on its TDLR filing.
๐Scope of Work
interior alteration of existing 3rd floor tenant to occupy 3rd floor of bldg. 3. Approx 14,431sf of interior alteration
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 5, 2020
Review Complete
Inspection Complete
Closed
Jan 31, 2023
๐Related Projects
๐คSame Owner
$777.1M total๐Related City Permits
Building permits found at or near this location
lexington parke / new landscape for irrigation
Lexington parke / new landscape for irrigation
Contreras - 39-90125 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull.
Contreras - 39-90125 - Install new 7.6kW rooftop solar system to existing residential only using backfed breaker only.
Replacement of complete existing central heat and air system with or without duct work change out