Bonner Carrington is a renovation/alteration project at 901 S Mopac Expressway, Building V, Suite 205, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $300K across about 2,426 sq ft.
Project has been completed and closed
Bonner Carrington is a Renovation/Alteration project located at 901 S Mopac Expressway, Building V, Suite 205, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $300K covering 2,426 sq ft. Barton Oaks Plaza V, LP is the property owner and Sixthriver is the design firm of record. The project was registered with TDLR on May 19, 2020.
Bonner Carrington is a renovation/alteration project at 901 S Mopac Expressway, Building V, Suite 205 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration of a new suite created from a part of an existing suite.
Construction on Bonner Carrington is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.
Bonner Carrington is located at 901 S Mopac Expressway, Building V, Suite 205, Austin, TX, 78746, in Travis County.
Barton Oaks Plaza V, LP is the property owner/developer of record for Bonner Carrington, per its TDLR project registration.
Sixthriver is the design firm of record for Bonner Carrington, according to its TDLR filing.
Bonner Carrington has an estimated construction value of $300K and approximately 2,426 square feet (about $124/sqft), based on its TDLR filing.
Interior alteration of a new suite created from a part of an existing suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 19, 2020
Review Complete
Inspection Complete
Closed
Sep 16, 2020
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.