Spec. Suite 2550
Spec. Suite 2550 is a renovation/alteration project at 1 Riverway, Suite 2550, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2020). The project has an estimated value of $140K across about 4,810 sq ft.
๐Project Metrics
TDLR #TABS2020017663Project Closed
Project has been completed and closed
Spec. Suite 2550 is a Renovation/Alteration project located at 1 Riverway, Suite 2550, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $140K covering 4,810 sq ft. Unilev is the property owner and Ziegler Cooper is the design firm of record. The project was registered with TDLR on May 20, 2020.
โFrequently Asked Questions
What is Spec. Suite 2550?
Spec. Suite 2550 is a renovation/alteration project at 1 Riverway, Suite 2550 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing lease space
Is Spec. Suite 2550 open in Houston?
Construction on Spec. Suite 2550 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2020. The building is finished and very likely open.
Where is Spec. Suite 2550 located?
Spec. Suite 2550 is located at 1 Riverway, Suite 2550, Houston, TX, 77056, in Harris County.
Who is the owner or developer of Spec. Suite 2550?
Unilev is the property owner/developer of record for Spec. Suite 2550, per its TDLR project registration.
Who is the architect or design firm for Spec. Suite 2550?
Ziegler Cooper is the design firm of record for Spec. Suite 2550, according to its TDLR filing.
How much does Spec. Suite 2550 cost and how big is it?
Spec. Suite 2550 has an estimated construction value of $140K and approximately 4,810 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 20, 2020
Review Complete
Inspection Complete
Closed
Oct 31, 2020