SMU-Washburne Soccer and Track Stadium
SMU-Washburne Soccer and Track Stadium is a new construction project at Ownby Dr, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2022). The project has an estimated value of $5.0M across about 13,380 sq ft.
๐Project Metrics
TDLR #TABS2020018815Project Closed
Project has been completed and closed
SMU-Washburne Soccer and Track Stadium is a New Construction project located at Ownby Dr, Dallas, TX 75206 in Dallas, Texas. The project has an estimated value of $5.0M covering 13,380 sq ft. Southern Methodist University (SMU) is the property owner and Glenn Partners is the design firm of record. The project was registered with TDLR on June 10, 2020.
โFrequently Asked Questions
What is SMU-Washburne Soccer and Track Stadium?
SMU-Washburne Soccer and Track Stadium is a new construction project at Ownby Dr in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New locker rooms, bleachers, team room, training room and press box with elevators
Is SMU-Washburne Soccer and Track Stadium open in Dallas?
Construction on SMU-Washburne Soccer and Track Stadium is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2022. The building is finished and very likely open.
Where is SMU-Washburne Soccer and Track Stadium located?
SMU-Washburne Soccer and Track Stadium is located at Ownby Dr, Dallas, TX, 75206, in Dallas County.
Who is the owner or developer of SMU-Washburne Soccer and Track Stadium?
Southern Methodist University (SMU) is the property owner/developer of record for SMU-Washburne Soccer and Track Stadium, per its TDLR project registration.
Who is the architect or design firm for SMU-Washburne Soccer and Track Stadium?
Glenn Partners is the design firm of record for SMU-Washburne Soccer and Track Stadium, according to its TDLR filing.
How much does SMU-Washburne Soccer and Track Stadium cost and how big is it?
SMU-Washburne Soccer and Track Stadium has an estimated construction value of $5.0M and approximately 13,380 square feet (about $374/sqft), based on its TDLR filing.
๐Scope of Work
New locker rooms, bleachers, team room, training room and press box with elevators
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 10, 2020
Review Complete
Inspection Complete
Closed
Apr 1, 2022
๐Related Projects
๐คSame Owner
$467.3M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas