OFFICE 49
๐Project Metrics
TDLR #TABS2020020278Project Closed
Project has been completed and closed
๐Scope of Work
NEW SINGLE STORY, WITH MEZZANINE, COMMONS BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$832K total๐Related City Permits
Building permits found at or near this location
Interior remodel: Front door area install a new front door where the existing window is. 12/1/25 SM Revised: Guest room bathroom remodel
15ft tunnel sewer line repair underneath the foundation of the home
24kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (David Jackson)
REPLACEMENT TO 25FT OF SEWER LINE IN YARD
Relocate the curb / side walk gas meter to the back of the building. Per Tx Gas relocation project.