Swabstick filling room
Swabstick filling room is a renovation/alteration project at 1550 Northwestern Drive, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2021). The project has an estimated value of $1.0M across about 2,128 sq ft.
๐Project Metrics
TDLR #TABS2020021411Project Closed
Project has been completed and closed
Swabstick filling room is a Renovation/Alteration project located at 1550 Northwestern Drive, El Paso, TX 79912 in El Paso, Texas. The project has an estimated value of $1.0M covering 2,128 sq ft. Care Fusion 213 LLC is the property owner and New Republic Architects is the design firm of record. The project was registered with TDLR on July 30, 2020.
โFrequently Asked Questions
What is Swabstick filling room?
Swabstick filling room is a renovation/alteration project at 1550 Northwestern Drive in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new clean room to manufacture pharmaceutical products.
Is Swabstick filling room open in El Paso?
Construction on Swabstick filling room is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2021. The building is finished and very likely open.
Where is Swabstick filling room located?
Swabstick filling room is located at 1550 Northwestern Drive, El Paso, TX, 79912, in El Paso County.
Who is the owner or developer of Swabstick filling room?
Care Fusion 213 LLC is the property owner/developer of record for Swabstick filling room, per its TDLR project registration.
Who is the architect or design firm for Swabstick filling room?
New Republic Architects is the design firm of record for Swabstick filling room, according to its TDLR filing.
How much does Swabstick filling room cost and how big is it?
Swabstick filling room has an estimated construction value of $1.0M and approximately 2,128 square feet (about $470/sqft), based on its TDLR filing.
๐Scope of Work
A new clean room to manufacture pharmaceutical products.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 30, 2020
Review Complete
Inspection Complete
Closed
Mar 19, 2021