Riverplace Phase 2
Riverplace Phase 2 is a additions to existing building project at 109 W. 2nd Street, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.7M across about 6,407 sq ft.
๐Project Metrics
TDLR #TABS2020021472Review Complete
Design review complete, construction may proceed
Riverplace Phase 2 is a Additions to Existing Building project located at 109 W. 2nd Street, Georgetown, TX 78626 in Georgetown, Texas. The project has an estimated value of $1.7M covering 6,407 sq ft. WBW Development, LLC is the property owner. The project was registered with TDLR on July 31, 2020.
โFrequently Asked Questions
What is Riverplace Phase 2?
Riverplace Phase 2 is a additions to existing building project at 109 W. 2nd Street in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two story office building addition with third floor accessory storage
Is Riverplace Phase 2 open in Georgetown?
Riverplace Phase 2 is currently under construction in Georgetown, TX. Its current TDLR status is "Review Complete".
Where is Riverplace Phase 2 located?
Riverplace Phase 2 is located at 109 W. 2nd Street, Georgetown, TX, 78626, in Williamson County.
Who is the owner or developer of Riverplace Phase 2?
WBW Development, LLC is the property owner/developer of record for Riverplace Phase 2, per its TDLR project registration.
How much does Riverplace Phase 2 cost and how big is it?
Riverplace Phase 2 has an estimated construction value of $1.7M and approximately 6,407 square feet (about $265/sqft), based on its TDLR filing.
๐Scope of Work
Two story office building addition with third floor accessory storage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 31, 2020
Review Complete
Jul 31, 2020
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$4.7M total๐Related City Permits
Building permits found at or near this location
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio.
Emergency Disconnect Replace Main Breaker Like for Like Update Grounding and add surge protection
Remodel to first floor to demise amenity space for building which will be available to all tenants. Suite 100 is being reduced in size by the new demising wall but no work will be done in Suite 100.
temporary tpole for new construction in Wildhorse ref BP: 2026-083987
Remodel to first floor to demise amenity space for building which will be available to all tenants. Suite 100 is being reduced in size by the new demising wall but no work will be done in Suite 100.