Baty Elementary School Veneer Repair
๐Project Metrics
TDLR #TABS2020022623Project Closed
Project has been completed and closed
๐Scope of Work
Replace existing exterior masonry veneers all around the building with new brick and stone veneers. Replace existing exterior windows and doors with new.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
ATT is proposing to install on tower 3 Ericsson Air antennas 3 Ericsson remote radios 3 2.5 STD x 10 mount pipes 3 Rosenberger mounting brackets. Ground scope of work 1 DC power plant 10 DC converters 11 48V DC converters 6 50A DC breakers 1 48V Battery rack. No change of tower height nor ground disturbance.
Upgrade existing equipment/modifications to existing cell site. Details are shown in the attached construction drawings.
Add/Remove/Swap of equipment to existing Wireless Telecom Tower
Partial repair to failed drain line by tunnel
Access by tunnel to repair failed drain piping
๐Related Site Plans
City of Austin site plan approvals at this location