GAPCO 3.0
GAPCO 3.0 is a renovation/alteration project at 520 Lockwood Drive, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $400K across about 4,875 sq ft.
๐Project Metrics
TDLR #TABS2020022688Inspection Complete
Final inspection completed, awaiting project closure
GAPCO 3.0 is a Renovation/Alteration project located at 520 Lockwood Drive, Richardson, TX 75080 in Richardson, Texas. The project has an estimated value of $400K covering 4,875 sq ft. David Harrel is the property owner and Plan B Group is the design firm of record. The project was registered with TDLR on August 24, 2020.
โFrequently Asked Questions
What is GAPCO 3.0?
GAPCO 3.0 is a renovation/alteration project at 520 Lockwood Drive in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish-out
Is GAPCO 3.0 open in Richardson?
Construction on GAPCO 3.0 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.
Where is GAPCO 3.0 located?
GAPCO 3.0 is located at 520 Lockwood Drive, Richardson, TX, 75080, in Dallas County.
Who is the owner or developer of GAPCO 3.0?
David Harrel is the property owner/developer of record for GAPCO 3.0, per its TDLR project registration.
Who is the architect or design firm for GAPCO 3.0?
Plan B Group is the design firm of record for GAPCO 3.0, according to its TDLR filing.
How much does GAPCO 3.0 cost and how big is it?
GAPCO 3.0 has an estimated construction value of $400K and approximately 4,875 square feet (about $82/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 24, 2020
Review Complete
Inspection Complete
Jun 15, 2021
Closed